Click here to view the "Equipment Inspection" video
This article assumes that equipment and templates have already been created in the system. If these items have not yet been set up, please complete those configurations first, as they are required for the steps outlined in this article.
Step #1
Navigate to the "Equipment Maintenance" Team.
Step #2
Click here to access the "Inspections Manager" sub-menu.
Step #3
Click "Equipment Inspections"
Step #4
Click "Create Equipment Inspection"
Step #5
Enter the following details:
- Equipment
- Template
Step #6
Enter the following details:
- Lot Serial #
Step #7
Click "Create Inspection".
Step #8
The following fields are optional but can be added if applicable:
- Timesheet Entries
- Notes
Step #9
Complete the Inspection Characteristics and add any applicable signatures.
Step #10
Click to "Sign and Finalize" the sample.
Step #11
Repeat Steps 9 & 10 for each sample.
Step #12
Once all Samples have been inspected, click "Save and Finalize" to close the Inspection.
If the equipment Inspection has failed, it is possible to Initiate a Corrective Action Report or a Non-Conformance Report or an OOS Report.
Step #13
Click here to download a PDF of your report.